Bezel, Instrument Panel, Center: Installation: Installation
- Connect the HVAC electrical connectors (1). Refer to CONTROL, A/C AND HEATER, INSTALLATION .
- Align and position the center bezel (2) onto the I/P (1) and hand tap to seat the retaining clips fully.
- Reconnect the negative battery cable.

